Specialists in Precast Concrete Flooring
Safe Load Capacity (kN/m2) for 210 Homefloor (excluding self weight)
• Self Weight: 2.5kN/m2 ungrouted 3.02kN/m2 grouted
• Allowance should be made for finishes eg: 0.2kN/m2 for timber battons, 2.4kN/m2 for 100mm
sand / cement screed
• Load capacity can be enhanced with the use of structural screed
From start to finish the floor can be completed in less than 10 working days!